ANGEBOT IPA 17/M – OSRAM – Determination and TCO Evaluation of Production Output Improvements

 
Determination and TCO Evaluation of Production Output Improvements @ Electronics Production
Ausgangssituation / Randbedingungen
Existing Electronic LEDr Classic A – Lamp production in Eichstätt to be improved.

Arbeitspakete ‚Determination and TCO Evaluation of Production Output Improvements‘

Evaluation Points

  • Evaluation of current state of Production and Material flow at Electronic LEDr Classic A – Lamp production at Eichstätt: Time study evaluation, Value add analyze & Production Layout analyze
  • Determination of possible Production Output Improvements: Automation Concepts, Bottleneck elimination, Machine up time improvements, Planned Maintenance strategy
  • Benchmark of Different solutions with dedicated TCO calculation (based on volume, stock costs, operator costs)
  • Define together with global Manufacturing responsible the final Project implementation strategy
  • Implement evaluated measures at production line at Eichstätt
  • Finalize Output Improvement Calculation and Saving overview
  • Prepare Management Presentation

Lösungsansatz / Aufgabenstellung
Phase 1:
Define and Analyze Current State at Electronic LEDr Classic A – Lamp production at Eichstätt
Phase 2:
Define & implement of measures for Production Output Improvements, Saving calculation

Teamgröße – Besondere Anforderungen – Standort

  • Ideale Teamgröße: 2-3 Studierende
  • MS-Produkte (vor allem Excel, Access)
  • Verständnis Technischer Zusammenhänge & Lean Manufacturing
  • OSRAM / Eichstätt
Industrie-
partner
Anschrift OSRAM
Parkring 33
85748 Garching
Betreuung Industrie
Studen-tisches Team
Betreuung Hochschule
Projektskizze IPA 17/M – OSRAM – Production Output Improvements